London Underground Power Upgrades SSR 4
As part of the SSR4 upgrade scheme to the London Underground ABB appointed Clear Route to conduct 11kV Cable Installation on the Metropolitan Line between Baker Street and Finchley Road. Client ABB Scope The works consisted of: SSR4 – Baker…