London Underground Power Upgrades SSR 4

As part of the SSR4 upgrade scheme to the London Underground ABB appointed Clear Route to conduct 11kV Cable Installation on the Metropolitan Line between Baker Street and Finchley Road. Client ABB Scope The works consisted of: SSR4 – Baker…

Read More

London Underground Power Upgrades SSR 3

As part of the SSR3 upgrade scheme to the London Underground UK Power Network Services appointed Clear Route to conduct 11kV Cable Installation. Client UK Power Networks Services Scope Installation of new 11kV 3 core cable delivered by train, road…

Read More

London Underground Power Upgrades SSR 2

Client London Underground Limited Scope Refurbishment and re-construction of Embankment Substation (a disused underground substation). This was part of London Underground’s Sub Surface Railways Upgrade Package 2. The works consisted of: Demolition and removal of existing concrete and steel structures…

Read More

Sutton Grange Biomass 33 kV Connection

Client CG Power Scope Connection of an Anaerobic Digester plant to the local Western Power Distribution (WPD) 33 KV network. Works were carried out by CRL as an Approved Lloyds Registered NERS Utility Connections Provider (UCP). Establishment of a new…

Read More
SELCHP Feasibilty Study

London Underground Power Sourcing 22kV

Client London Underground Limited (LUL) Scope Develop a Conceptual Design Specification (CDS) for a 39 MVA 22 kV Connection between LUL Greenwich Power Station and SELCHP (South East London Combined Heat & Power). Liaison with the Royal Borough or Greenwich…

Read More

Nelson Street Feasibility Study

The scheme in the East London area involves critical new EHV electrical circuits necessary to ensure this area has constant and uninterrupted supply. Solution Clear Route involvement in this project commenced at the planning stage, where various route options were…

Read More

Elstree Feasibility Study

The Electricity network with this area of North London needed to be reinforced due to a number of operational performance issues with the existing network. The local DNO engaged Clear Route to undertake a "Desktop Study" to assess any proposed routes for…

Read More

London Bridge Feasibility Study

Due to the proposed redevelopment of this area of Central London, an existing EHV cable needed to be diverted. UKPN engaged Clear Route to undertake a Feasibility Study to assess a proposed route for new EHV cables. Solution This exercise…

Read More
Telehouse 132kV Connection

Telehouse 132 kV Connection

Summary of Project The Client Telehouse Europe was expanding its existing colocation facility at the London Data Centre in Docklands and required a new on-site 50 MVA primary substation with cooling. This required two 132kV circuits connected to the local…

Read More
Bankside Tunnel Excavation

Bankside Tunnel

Background UK Power Networks (formerly EDF Energy) awarded Clear Route Limited a contract to install test and commission a new 11kV cable between Bankside Substation and Newington House in Central London. The Contract was awarded in 2010 with all works…

Read More