skip to Main Content
+44 (0) 7976 623 603 +44 (0) 7976 623 557 +44 (0) 7967 037 556 [email protected]

London Underground Power Upgrades SSR 4

As part of the SSR4 upgrade scheme to the London Underground ABB appointed Clear Route to conduct 11kV Cable Installation on the Metropolitan Line between Baker Street and Finchley Road. Client ABB Scope The works consisted of: SSR4 – Baker…

Read More

London Underground Power Upgrades SSR 3

As part of the SSR3 upgrade scheme to the London Underground UK Power Network Services appointed Clear Route to conduct 11kV Cable Installation. Client UK Power Networks Services Scope Installation of new 11kV 3 core cable delivered by train, road…

Read More
SELCHP Feasibilty Study

London Underground Power Sourcing 22kV

Client London Underground Limited (LUL) Scope Develop a Conceptual Design Specification (CDS) for a 39 MVA 22 kV Connection between LUL Greenwich Power Station and SELCHP (South East London Combined Heat & Power). Liaison with the Royal Borough or Greenwich…

Read More

Railway Survey

An underground pipe was to be installed using pipe jack technology underneath a busy network of London Underground tracks. Solution Clear Route were instructed to undertake a Topographical Survey to cover the route of a proposed pipe-jack across an extensive…

Read More
North West Trains

South East Trains

We are an approved contractor to work on Network Rail Infrastructure, using our In house personnel to manage and deliver works.

Read More
Western Deep Sewer Victoria Transport Interchange

Victoria Transport Interchange

Due to the redevelopment of Victoria Station and surrounding area, works will be directly above the Western Deep Sewer some 30m below the surface. Solution: The concrete wedge block sewer required strengthening with stainless steel straps at every one of…

Read More
Back To Top