skip to Main Content
+44 (0) 7976 623 603 +44 (0) 7976 623 557 +44 (0) 7967 037 556 [email protected]
SELCHP Feasibilty Study

SELCHP Feasibility Study

We carried out a detailed feasibility study on behalf of London Underground Ltd to investigate the possibility of establishing a new 22 kV cable between South East London Combined Heat & Power (SELCHP) and the LUL Greenwich Power Station. The project…

Read More
Back To Top