skip to Main Content
+44 (0) 20 8731 4359 / 4360 [email protected]
SELCHP Feasibilty Study

SELCHP Feasibility Study

We carried out a detailed feasibility study on behalf of London¬†Underground Ltd to investigate the possibility of establishing a new 22 kV cable between South East London Combined Heat & Power (SELCHP) and the LUL Greenwich Power Station. The project…

Read More
Back To Top