skip to Main Content
+44 (0) 7976 623 603 +44 (0) 7976 623 557 +44 (0) 7967 037 556 [email protected]
Tunnel Survey

West Ham Cable Tunnel Survey

Clear Route Limited was engaged to carry out a full tunnel survey of two existing…

read more

Leeds District Heating Network Feasibility Study

Clear Route Limited were engaged by Veolia Energy Services to investigate the possibility of installing…

read more

Northern Line Extension – Pre Articulation Survey

The Northern line extension is a project to extend the London Underground Northern line from…

read more

Thames Tideway

The Thames Tideway Project is a major new sewer, designed with the purpose of protecting…

read more

London Underground Power Upgrades SSR 3

As part of the SSR3 upgrade scheme to the London Underground UK Power Network Services…

read more

London Underground Power Upgrades SSR 4

As part of the SSR4 upgrade scheme to the London Underground ABB appointed Clear Route…

read more
Telehouse 132kV Connection

Telehouse 132 kV Connection

Summary of Project The Client Telehouse Europe was expanding its existing colocation facility at the…

read more
Telehouse Substation

Great Ormond Street Hospital

Summary Clear Route Limited were engaged by UK Power Networks on behalf of its Client,…

read more
Bankside Tunnel Excavation

Bankside Tunnel

Background UK Power Networks (formerly EDF Energy) awarded Clear Route Limited a contract to install…

read more
Civil Engineering

Stanlow CCU Regen

Clear Route Utility Services Limited has been involved in the replacement of the Regeneration head…

read more
Western Deep Sewer Victoria Transport Interchange

Victoria Transport Interchange

Due to the redevelopment of Victoria Station and surrounding area, works will be directly above…

read more

Basement and Drainage Connectivity Survey

Surface water modelling is required in a major urban area prone to flooding when the…

read more

London Underground Power Upgrades SSR 2

Client London Underground Limited Scope Refurbishment and re-construction of Embankment Substation (a disused underground substation).…

read more

Sutton Grange Biomass 33 kV Connection

Client CG Power Scope Connection of an Anaerobic Digester plant to the local Western Power…

read more
SELCHP Feasibilty Study

London Underground Power Sourcing 22kV

Client London Underground Limited (LUL) Scope Develop a Conceptual Design Specification (CDS) for a 39…

read more

Elstree Feasibility Study

The Electricity network with this area of North London needed to be reinforced due to…

read more

Hostels for the Homeless

Hostels for the homeless in North, East, South and West London were to be refurbished.…

read more

Woodside Park – London Underground

A new surface water sewer is to be installed crossing the railway at Woodside Park…

read more

London Bridge Feasibility Study

Due to the proposed redevelopment of this area of Central London, an existing EHV cable…

read more

Bathymetric Survey – Walthamstow Reservoirs

A new overflow structure is to be constructed across a common embankment between Walthamstow No.3…

read more

The Northern Outfall Survey

A survey was required to ascertain if there was a requirement to adjust weir levels…

read more

Ground Probing Radar – LNG Isle of Grain

In 1953 Anglo Persian Oil Company, later named British Petroleum, developed a large Oil Refinery…

read more

Fleet Sewer Survey

A new underground electricity substation was being considered using the site of an existing toilet…

read more

Pre-Directional Drill Survey

A number of electricity ducts were to be installed, and with a section of the…

read more

St Johns Churchyard Survey

St John-at-Hackney Churchyard Gardens was the burial ground of Hackney's first parish church of St…

read more

Railway Survey

An underground pipe was to be installed using pipe jack technology underneath a busy network…

read more

Southwark Bridge – Route Proving

A major utility company was investigating the viability of a planned multi-duct installation over a…

read more

Setting Out Services

An extension to the Docklands Light Railway to London City Airport, required piers and structures…

read more

Nelson Street Feasibility Study

The scheme in the East London area involves critical new EHV electrical circuits necessary to…

read more

Tunnel Shaft Location Survey

An underground tunnel was being constructed underneath the streets of London, and a shaft down…

read more

Steelwork Squareness Survey

A major hospital in Cambridgeshire that required expansion, decided on a modular solution that required…

read more
SELCHP Feasibilty Study

SELCHP Feasibility Study

We carried out a detailed feasibility study on behalf of London Underground Ltd to investigate the…

read more
North West Trains

South East Trains

We are an approved contractor to work on Network Rail Infrastructure, using our In house…

read more
Back To Top