Due to the proposed redevelopment of this area of Central London, an existing EHV cable needed to be diverted. UKPN engaged Clear Route to undertake a Feasibility Study to assess a proposed route for new EHV cables.

Solution

This exercise differed from normal studies in that we were assessing information as usual, but also that obtained from other companies involved previously. This other information had consequently to be checked for completeness and accuracy before a decision could be made as to the viability of the proposed diversion route. All of these factors were taken into account, and a provisional route was determined that had the possibility of being successfully installed.