
SELCHP Feasibility Study
We carried out a detailed feasibility study on behalf of London Underground Ltd to investigate the possibility of establishing a new 22 kV cable between South East London Combined Heat & Power (SELCHP) and the LUL Greenwich Power Station.
The project produced a Conceptual Design Statement (CDS) detailing the route along with the calculation of ampacity for the new cable to be installed.