skip to Main Content
+44 (0) 20 8731 4360 [email protected]
SELCHP Feasibility Study

SELCHP Feasibility Study

We carried out a detailed feasibility study on behalf of London Underground Ltd to investigate the possibility of establishing a new 22 kV cable between South East London Combined Heat & Power (SELCHP) and the LUL Greenwich Power Station.

The project produced a Conceptual Design Statement (CDS) detailing the route along with the calculation of ampacity for the new cable to be installed.

Back To Top