Stanlow CCU Regen
Clear Route Utility Services Limited has been involved in the replacement of the Regeneration head at Stanlow.
During a major shutdown period, the project was undertaken to replace the Regeneration Head of the CCU. The replacement head was delivered to site earlier in the year, which required the closure of the M53 to enable the transportation of the equipment from the docks at Ellesmere Port to Stanlow.