Clear Route Limited was engaged to carry out a full tunnel survey of two existing…
Victoria Transport Interchange
Due to the redevelopment of Victoria Station and surrounding area, works will be directly above the Western Deep Sewer some 30m below the surface.
Solution: The concrete wedge block sewer required strengthening with stainless steel straps at every one of the 230 segments at 600mm centres in the zone of influence.
A wriggle survey was carried out pre-design and post works. A monitoring scheme was installed prior to works using total station, precise level and extensometer.
Client: Thames Water
Budget: £100,000
Services: Site Surveying, Infrastructure Engineering