London Underground Power Upgrades SSR 2
Client
London Underground Limited
Scope
Refurbishment and re-construction of Embankment Substation (a disused underground substation). This was part of London Underground’s Sub Surface Railways Upgrade Package 2.
The works consisted of:
- Demolition and removal of existing concrete and steel structures
- Structural steelwork strengthening of the gallery floor level
- Construction of new reinforced concrete basement and gallery level floors
- Construction of a new personnel access from street level
- Construction of a new high level plant access hatch at roof level including re-roofing
- Construction of a new fire escape route from basement level to street level consisting of structural steelwork, suspended concrete slabs to a high level corridor and new block walls
- Construction of new block walls up to 6m high to form new rooms and fire compartments
- Installation of various steelwork stairs, platforms and hand railing
- Installation of new fire doors
- Fire protection to new and existing steelwork
- Painting & decoration