London Underground Power Upgrades SSR 2

Client

London Underground Limited

Scope

Refurbishment and re-construction of Embankment Substation (a disused underground substation). This was part of London Underground’s Sub Surface Railways Upgrade Package 2.
The works consisted of:

  • Demolition and removal of existing concrete and steel structures
  • Structural steelwork strengthening of the gallery floor level
  • Construction of new reinforced concrete basement and gallery level floors
  • Construction of a new personnel access from street level
  • Construction of a new high level plant access hatch at roof level including re-roofing
  • Construction of a new fire escape route from basement level to street level consisting of structural steelwork, suspended concrete slabs to a high level corridor and new block walls
  • Construction of new block walls up to 6m high to form new rooms and fire compartments
  • Installation of various steelwork stairs, platforms and hand railing
  • Installation of new fire doors
  • Fire protection to new and existing steelwork
  • Painting & decoration