The Northern Outfall Survey

A survey was required to ascertain if there was a requirement to adjust weir levels in the Northern Outfall.

Solution

Clear Route undertook a detailed 3D Survey of the 4 – Northern Outfall Barrels at Wick, East London adjacent to the Olympic Stadium.
The Survey included the main structural walls, soffits, inverts, access shafts, individual weirs, Stop Log slots and Penstock gates.