As part of the SSR4 upgrade scheme to the London Underground ABB appointed Clear Route…
London Underground Power Sourcing 22kV
Client
London Underground Limited (LUL)
Scope
- Develop a Conceptual Design Specification (CDS) for a 39 MVA 22 kV Connection between LUL Greenwich Power Station and SELCHP (South East London Combined Heat & Power).
- Liaison with the Royal Borough or Greenwich & London Borough of Lewisham and other stakeholders to establish potential cable route options.
- Calculation of cable ampacity options for cable size selection and impact on existing adjacent LU feeder cables.
- Identify areas of Special Engineering Difficulty (SED)
- Carry out route proving of existing ducts and pits
- Development of a fully costed and programme proposal.