skip to Main Content
+44 (0) 7976 623 603 +44 (0) 7976 623 557 +44 (0) 7967 037 556 [email protected]
Tunnel Survey

West Ham Cable Tunnel Survey

Clear Route Limited was engaged to carry out a full tunnel survey of two existing Electricity cable tunĀ­nels to enable the development of various key environmental and planning statements for future developĀ­ments. The tunnels are maintained by UK Power Networks…

Read More

Leeds District Heating Network Feasibility Study

Clear Route Limited were engaged by Veolia Energy Services to investigate the possibility of installing a District Heating Network and new Electricity connection from a waste facility on the outskirts of the town, to a hospital situated in the City…

Read More

Northern Line Extension – Pre Articulation Survey

The Northern line extension is a project to extend the London Underground Northern line from Kennington to Battersea in South West London, terminating at the redeveloped Battersea Power Station. The extension will form a continuation of the Charing Cross branch…

Read More

Thames Tideway

The Thames Tideway Project is a major new sewer, designed with the purpose of protecting the River Thames from pollution. London's Victorian sewerage system is no longer fit for purpose and under heavy flow conditions it can spill millions of…

Read More

Steelwork Squareness Survey

A major hospital in Cambridgeshire that required expansion, decided on a modular solution that required to be linked to the existing building. Solution A particular service offered by Clear Route has been the checking for squareness and level of streelwork…

Read More

Tunnel Shaft Location Survey

An underground tunnel was being constructed underneath the streets of London, and a shaft down to the route of this tunnel was necessary to be excavated. Solution Prior to the proposed excavation of an access shaft to the underground tunnel,…

Read More

Nelson Street Feasibility Study

The scheme in the East London area involves critical new EHV electrical circuits necessary to ensure this area has constant and uninterrupted supply. Solution Clear Route involvement in this project commenced at the planning stage, where various route options were…

Read More

Setting Out Services

An extension to the Docklands Light Railway to London City Airport, required piers and structures to be constructed to support the elevated railway. Solution Clear Route was instructed to set out the position of supporting reinforced concrete piers for the…

Read More

Pre-Directional Drill Survey

A number of electricity ducts were to be installed, and with a section of the route involving a busy dual-carriageway and difficult terrain, the most economical option was to install these ducts with the use of Directional Drilling. Solution Clear…

Read More

Railway Survey

An underground pipe was to be installed using pipe jack technology underneath a busy network of London Underground tracks. Solution Clear Route were instructed to undertake a Topographical Survey to cover the route of a proposed pipe-jack across an extensive…

Read More
Back To Top