St Johns Churchyard Survey

St John-at-Hackney Churchyard Gardens was the burial ground of Hackney's first parish church of St Augustin. The burial ground was converted into a public garden with the graves being grassed over and headstones moved to the perimeter and chest tombs…

Read More

Fleet Sewer Survey

A new underground electricity substation was being considered using the site of an existing toilet block in Farringdon Street, London. Solution All utility services were mapped in at street level including the depth and exact position of the Victorian Fleet…

Read More

Elstree Feasibility Study

The Electricity network with this area of North London needed to be reinforced due to a number of operational performance issues with the existing network. The local DNO engaged Clear Route to undertake a "Desktop Study" to assess any proposed routes for…

Read More

The Northern Outfall Survey

A survey was required to ascertain if there was a requirement to adjust weir levels in the Northern Outfall. Solution Clear Route undertook a detailed 3D Survey of the 4 - Northern Outfall Barrels at Wick, East London adjacent to…

Read More

Basement and Drainage Connectivity Survey

Surface water modelling is required in a major urban area prone to flooding when the drainage system is overloaded. Basements and contents within, have encountered flood damage. Solution Topographic, buried service mapping and basement surveys were undertaken. Basement floor, ceiling…

Read More

Ground Probing Radar – LNG Isle of Grain

In 1953 Anglo Persian Oil Company, later named British Petroleum, developed a large Oil Refinery at the Isle of Grain in Kent. The refinery was a victim of decline in the demand of oil products after 1973. It was closed…

Read More

Southwark Bridge – Route Proving

A major utility company was investigating the viability of a planned multi-duct installation over a total length of 550m. The route planned to utilise any available space within carriageway and footways, and included crossing Southwark Bridge in Central London. Solution…

Read More

Bathymetric Survey – Walthamstow Reservoirs

A new overflow structure is to be constructed across a common embankment between Walthamstow No.3 and No.5 Reservoirs. Detail of the reservoir bed level in Walthamstow No.3 Reservoir is required. Silt and bed levels were required on a 2 m…

Read More

London Bridge Feasibility Study

Due to the proposed redevelopment of this area of Central London, an existing EHV cable needed to be diverted. UKPN engaged Clear Route to undertake a Feasibility Study to assess a proposed route for new EHV cables. Solution This exercise…

Read More

Hostels for the Homeless

Hostels for the homeless in North, East, South and West London were to be refurbished. Arlington House in Camden Town Mare Street Hackney Dean Street Soho Ennersdale Road Lewisham Solution Topographical, Building, Underground Services surveys and Elevations were undertaken for…

Read More