As part of the SSR4 upgrade scheme to the London Underground ABB appointed Clear Route…
London Underground Power Upgrades SSR 3
As part of the SSR3 upgrade scheme to the London Underground UK Power Network Services appointed Clear Route to conduct 11kV Cable Installation.
Client
UK Power Networks Services
Scope
- Installation of new 11kV 3 core cable delivered by train, road and by hand onto new brackets, into ducts or inverts including all associated dressing and temporary supports
- Route enabling works (re-location of ballast, removal of existing brackets, installation of new brackets)
- Construction of Over Track Crossings (OTX) and Under Track Crossings
- Installation of new Ducted Routes
- Supply and Installation of new brackets within London Underground Tunnels and substations
- Supply and installation of cable joints
- Confined Space Working within Tunnel & Pits