The works consisted of:
SSR4 – Baker Street to Finchley Road- 11kV Installation

  • Installation of new 11kV and 22kV 3core cable delivered by train, road and by hand onto new brackets, into ducts or inverts including all associated dressing and temporary supports
  • Route enabling works (re-location of ballast, removal of existing brackets, installation of new brackets)
  • Construction of Over Track Crossings (OTX) and Under Track Crossings
  • Installation of new Ducted Routes
  • Supply and Installation of new brackets within London Underground Tunnels and substations
  • Supply and installation of cable joints
  • Confined Space Working within Tunnel & Pits